煤电
The coal power sector is the foundation of the development of the group company and the expansion and extension of the industrial chain。There are 8 production mines with a total approved annual coal production capacity of 16.24 million tons and coal reserves of 8.8.6 billion tons, recoverable resource reserves 5.72亿吨。The total installed power capacity is 800 thousand kilowatts。随着景泰白岩子煤矿、肃北红沙梁煤矿、窑街深部及海石湾深部技术改造、罗川煤矿、红沙岗煤矿、东水泉煤矿等宝威体育开发建设及改扩建,Baiyin Thermal power phase II and Yaojie thermal power project construction and operation,预计2025年煤炭总产能将宝威体育2900万吨、宝威体育APP总宝威体育APP将宝威体育300宝威体育。